About Van Bi (Ball Valve)



We provide a variety of top quality industrial valves to clients throughout South and West Texas. We are the leading distributor of premium quality YVC shutoffs, providing high quality construction with effective style features. YVC is a worldwide presence in the shutoff industry and also is very pertained to by customers in a variety of markets. We lug YVC products such as sphere valves, butterfly shutoffs, entrance shutoffs and also examine shutoffs.

To find out more concerning our variety of shutoff alternatives, see the info on this page or please contact us. Exactly how to make plaster ceiling. With gypsum making system is an utilized component in developing and also constructing interior space, it contributes to decoration, audio insulation, heat treatment as well as covering issues in construction. construction, at the same time it is very fire immune. Construction plasterboard sinking properly, properly, technically covered with plasterboard outside to bring aesthetic variables along with high safety. Video tutorial on exactly how to develop a specialist plaster ceiling.

Structure of submersible plaster ceiling:
- Key bar is a bearing bar suspended from the ceiling with clusters of booster and also suspension bars.

- Additional bar associated with the primary bar, getting in touch with the ceiling straight.

- Members: bars attaching the wall or wall with the major bar and side bars.
- Gypsum board is a ceiling board gotten in touch with complementary bars, major bars as well as bars to cover the bone bar system to create the ceiling surface.

- Accessories: to connect plaster bars and also panels with each other to develop a completely immersed plaster ceiling system.

Just how to make an optimum ceiling plaster ceiling, reliable and also appropriate methods: After you have finished the ceiling and also roof, need to prepare the materials and also proceed with the complying with steps:

1. Decision of height of ceiling

- Usage laser or pipes Nivo to establish the height of the ceiling

- Mark the setting of the ceiling over the column or wall, typically choose the height of the wall surface at the end of the ceiling frame.

2. Dealt with the wall surface boundary bars

You can refer to even more attractive plaster ceiling below!

You use a drill, hammer nail to deal with the wall surface bars on the wall surface. And also the fastening openings 1 room smaller sized than 30cm to guarantee stability.

3. Separate the ceiling

Separate the ceiling surface area with the read more range appropriate to the range of the facility of the major bar contrasted to the side bars 800mm x 900mm

4. Hanging TY

You taken care of Ty suspension point with a straight drill with 8mm drill, connected by Ke and also Rub switches. The circulation of distance between companies is 1200mm and also the local business is 610mm from wall surfaces.

5. Mount the major bar

Key poles are set up at distances of 800 - 1200mm. The typical professional is 1000mm.

6. Mount the supporting bar

Set up the main bar and also primary bar directly or indirectly. After the setup is finished, the sight bar is edited and the frame is located nicely, uniformly and also the surface area is flat.

7. Installment of plasterboard ceiling

Plaster employee

Setup of the first plasterboard:

- Inspect home plate is intact or not.

- Screw the sheet with screws to ensure that the distance in between the screws is not higher than 20mm.

- Installation in such a way that the length of the plasterboard and side bars is vertical per other.

Installment of the 2nd plasterboard:

- Installment of the 2nd plate need to capture skewed with the side bar as well as pay attention to leave tiny voids.

Protected bare plaster for warm summers

8. Dealing with loosened powder covering joints

The connection between the sheet and also the screw head should be covered with baits. Make sure that when covering the surface with dough, it should Van cầu hơi (Globe Valve) be flat to avoid surges. When repainting the bait, between the panels, tape the surface mesh Click here for info to prevent breaking. The final stage is to utilize a saw to reduce and also trim the ceiling. Thus, the building process for plaster ceiling is completed,

Leave a Reply

Your email address will not be published. Required fields are marked *